projects
The turnkey projects we have implemented demonstrate a high level of professionalism and quality assurance at every stage—from design to commissioning.
"MODERNIZATION OF DISPATCH OPERATIONAL
AND TECHNOLOGICAL COMMUNICATION OF
JSC "KAZTRANSOIL" ANU FACILITIES
2024-2025, JSC “KazTransOil”
Installation and commissioning.
NATIONAL COORDINATION CENTER OF EMERGENCY
MEDICINE OF THE MINISTRY OF HEALTH OF THE
REPUBLIC OF KAZAKHSTAN IN ASTANA
2024, Mabco Constructions SA
Installation and commissioning works in the section ACS and AV.
MEDIUM AND MAJOR REPAIRS OF GAS GENERATORS
GPA (GAS PROCESSING UNIT)
2024,Asian Gas Pipeline LLP
Medium and major repairs of gas generators.
INFECTIOUS DISEASES HOSPITAL OF ALMATY
2023, Ministry of Health of the Republic of Kazakhstan, Mabetex
Construction and installation, commissioning, laying of cable systems. The nurse call system.
Structured cable networks
Structured cable networks
CONSTRUCTION OF A COMPLEX OF
MULTI-APARTMENT RESIDENTIAL
BUILDINGS WITH BUILT-IN,
ATTACHED PREMISES IN ASTANA
2023, Mabetex
Installation and commissioning of power supply
REPUBLICAN OLYMPIC TRAINING
CENTER IN ALMATY REGION
2023, Маbetex, Astana Building kz, Sports Committee of the Republic of Kazakhstan
Installation and commissioning of conference, audio and video systems of the building complex.
ATYRAU OIL PIPELINE MANAGEMENT
2022, JSC "KazTransOil"
Installation and commissioning works "Dispatch operational and technological communication system".
EXPANSION OF THE DESALINATION PLANT
"CASPIAN" IN AKTAU TO INCREASE DRINKING
WATER PRODUCTIVITY UP TO 40,000 M3/DAY
2022, Caspian Contractorsb Trust
External power supply.
THE TRADING HOUSE "QAMQOR CITY",
LOCATED AT: The city OF NUR SULTAN
2021, ТН «Qamqor City»
Installation and commissioning of the IDS & CCTV perimeter system at the facility "Reconstruction of the production building for the Qamqor City Trading House, located at 4/1 Sh.Beisekova Street, Astana"
URALSK AIRPORT
2021, KPO, KCG
Installation and commissioning works at the facility "Communications and installation of inspection equipment" West Kazakhstan region, Uralsk, Uralsk airport.
Installation and commissioning works on the project "Reconstruction of the terminal building of the Uralsk airport (correction)" West Kazakhstan region, Terektinsky district, Podstepnoye village"
We are trusted
Ready to get started?
Fill out the form so we can prepare a personalized offer for you.
Contacts
Bostandyk District, 19 Al-Farabi Avenue, Office 904, Almaty, Kazakhstan, 050000
Phone Number:
+7 778 911 1555
Email:
info@energysystems.kz
© 2025 EnergySystems